A CIL gravity circuit — combining Carbon-in-Leach leaching with upstream gravity concentration — is widely recognised as best practice for free-milling gold plants. Yet many operations run CIL alone, routing all ore directly to the leach circuit without first passing it through a gravity concentrator.

The result is a plant doing expensive chemical work on gold it could recover mechanically, in seconds, at a fraction of the cost.

Understanding what a CIL gravity circuit combination delivers — and what a CIL-only plant is leaving on the table — starts with understanding how each process works and where they complement each other.

A Knelson Concentrator installed at a Zimbabwean gold operation, commissioned by the Peacocke & Simpson team.

How CIL Works — and Where It Falls Short

CIL dissolves gold chemically using a cyanide solution. As the slurry passes through a series of agitated leach tanks, dissolved gold is adsorbed onto activated carbon, which is then stripped and refined to produce a gold doré.

CIL handles a wide range of gold grain sizes, works effectively on both coarse and fine gold, and achieves high overall recovery on free-milling ores. It is also continuous — unlike batch processes such as VAT leaching — making it suitable for high-throughput operations.

However, CIL is not without cost. Cyanide is expensive. Activated carbon must be regenerated and managed. Leach tanks represent significant capital investment. Furthermore, for coarse, free-milling gold specifically, CIL is a slow and costly way to achieve recovery that a gravity concentrator could deliver almost instantaneously.

The Fast Recovery Advantage of a CIL Gravity Circuit

The most immediate benefit a gravity circuit adds to a CIL gold plant is speed of recovery.

A Knelson Concentrator, for example, captures coarse gold in the grinding circuit or ahead of the leach tanks — recovering it in minutes rather than the hours a CIL circuit requires. At gold prices above $4,500 per ounce, every hour that coarse gold spends circulating through a leach circuit instead of being recovered represents a real cash flow cost.

For operations that need to demonstrate early revenue — junior miners in their first months of production, or projects repaying project finance — the ability to recover a meaningful proportion of gold rapidly through gravity is a genuine economic advantage. Furthermore, it reduces the inventory of gold sitting in the circuit at any given time, improving working capital efficiency.

The Grinding and Smearing Problem

A second, less obvious problem affects CIL-only plants: what happens to coarse gold during milling.

As ore passes through a grinding mill, coarse gold particles tumble against the mill charge — steel balls, ore fragments, and mill liners — and get physically abraded and flattened. This process, sometimes called gold smearing, breaks coarse gold into finer fragments and flattens them into thin films that adhere to other surfaces rather than liberating cleanly.

The result is fine and ultra-fine gold that is significantly harder to recover in the leach circuit than the original coarse particles would have been. Consequently, some of this material reports to tailings rather than being captured by carbon.

A gravity concentrator positioned in the grinding circuit — typically on the cyclone underflow — captures coarse gold before it is subjected to further grinding. It therefore removes it from the milling environment before smearing can occur, protecting recovery and reducing losses.

Cyanide Consumption and Leach Circuit Efficiency

Coarse gold dissolves slowly in cyanide solution. A large coarse gold particle entering a CIL circuit requires extended residence time and significant cyanide consumption before it fully dissolves.

Without gravity, the leach circuit must be designed with sufficient tank volume and retention time to handle coarse gold dissolution — adding capital cost and ongoing reagent expenditure to the plant design.

With a gravity circuit removing coarse gold ahead of leaching, the CIL circuit processes a feed effectively depleted of its coarsest, slowest-dissolving gold fraction. As a result, leach retention times can be shorter, reagent consumption is lower, and the overall circuit operates more efficiently.

In a high gold price environment, the operating cost saving from reduced cyanide consumption alone can justify the capital investment in a gravity circuit. Moreover, the benefit compounds over the life of the mine.

CIL vs CIP — and Where Gravity Fits With Both

It is worth briefly addressing the CIL versus CIP question, because gravity works effectively with both circuits.

CIL — where carbon is present in the leach tanks alongside the ore slurry — suits carbonaceous ores where dissolved gold might otherwise be re-adsorbed by natural carbon in the ore before the activated carbon captures it.

CIP — where leaching and carbon adsorption happen in separate stages — is generally more appropriate for clean, non-carbonaceous ores. It typically involves lower carbon attrition and can be more economical for the right ore type.

In both cases, a gravity circuit positioned before the leach stage captures coarse free-milling gold early and cheaply, reducing the load on whichever leach configuration follows. The choice between CIL and CIP is an ore-specific decision that testwork determines. However, the case for gravity applies regardless of which leach circuit follows.

GRG Testwork: Is a CIL Gravity Circuit Justified for Your Ore?

The decision to include a gravity circuit in a gold plant design should never rest on assumption. It should rest on GRG (Gravity Recoverable Gold) testwork — a well-established methodology used by metallurgists across Africa to quantify gravity concentration potential before plant design begins.

GRG testwork measures exactly how much of an ore’s gold is recoverable by gravity concentration under defined conditions — expressed as a percentage of total gold content. A high GRG result confirms that a meaningful proportion of the gold is coarse, free-milling, and responsive to gravity recovery. A low GRG result indicates that gravity will add little value and that the leach circuit must carry the full recovery burden.

For deposits with GRG values above roughly 20–30%, a gravity circuit is almost always economically justified. Above 40–50%, it becomes one of the most valuable design decisions a project can make.

EGRG (Extended GRG) testwork goes further — testing gravity recovery potential after additional comminution stages, revealing whether further grinding liberates additional gravity-recoverable gold. For some deposits, EGRG results significantly change the circuit design recommendation compared to standard GRG alone.

Without this testwork data, a CIL-only plant may be processing ore with significant gravity recovery potential and never know what it is missing.


Conclusion

A CIL-only gold plant is not a failing plant. But for any deposit with meaningful gravity-recoverable gold content, it is an incomplete one.

The combination of a gravity circuit and a CIL or CIP leach circuit delivers faster gold recovery, lower reagent consumption, protection against grinding losses, and better overall circuit economics — benefits that compound significantly over the life of a mine at today’s gold prices.

The starting point for knowing whether your ore justifies gravity is GRG testwork. It is one of the fastest, most cost-effective ways to understand your deposit’s recovery potential — and one of the most important inputs to a gold plant flowsheet design.

Contact us to discuss GRG testwork for your gold project.